Monday, 28 September 2015

Hawk Greens Resurfacing - Day 13

Ripping plywood to shape and form
bunker edges
Sand topdressing the completed greens
Manually dragging in the
sand topdressing
Rolling 5 Hawk green
13 Hawk gaining pin positions on the left side

Sunday, 27 September 2015

Hawk Update - Day 12

Preparing 6 Hawk green for Bentgrass sod
Mowing 5 Hawk green
First mow on 16 
Mowing and rolling 17 green
Installing new pond drain

Saturday, 26 September 2015

Hawk Greens Resurfacing - Day 11

Rolling 16 Hawk sod
16 Hawk green all completed
3 Hawk pond progress
Watering the sod we've laid on 4 Hawk
Holes 1,5,16,17,18 are completed

Friday, 25 September 2015

Hawk Resurfacing Update - Day 10

Current look of 3 Hawk pond wall
Mowing 1 Hawk green... already
Hand watering 16 Hawk green sod
right after being laid today

Thursday, 24 September 2015

Hawk Construction Update - Day 9

Adam Boismier using a sling
to strategically place rocks
into the creek on 2 Hawk
Irrigation installation beginning on 2 Hawk


3 Hawk pond wall looking incredible
4 Hawk receiving extra treatment to
prevent greens surface drainage
from being directed into the bunker

Wednesday, 23 September 2015

Hawk Resurfacing - Day 8

The selection process for the pond rocks on 3 Hawk is
quite tedious
Unloading the sod from the
transport trucks
The rebuild of 2 Hawk creek making
lots of progress
Keeping the rootzone moist with
irrigation
Laying the first bentgrass sod of the
project today
Hand watering the first completed
green - 1 Hawk

Tuesday, 22 September 2015

Hawk Resurfacing - Day 7

2 of the 5 fertilizer products being
applied to the sand base before sodding
3 Hawk pond wall growing

T1 Bentgrass sod being rolled up
in Twin Falls, Idaho

Bentgrass sod being loaded onto the
refrigerated trucks for delivery tomorrow


Monday, 21 September 2015

Hawk Resurfacing Update - Day 6

Last remaining greens surface was
removed this morning (8 Hawk)
Repairing compromised drainage
beneath 12 Hawk green
3 Hawk pond rock wall design
New rocks being placed around
3 Hawk pond
New 14" pond overflow pipe being
fused for 3 Hawk
First of the new turf was laid today
around 1 Hawk green

Sunday, 20 September 2015

Hawk Resurfacing Update - Day 5

3 Hawk - start of day 5
9 Hawk turf being piled for removal
Turf Care staff placing mats in the
high traffic areas to avoid wear
Tilling in new rootzone with existing
to prevent bridging
Shade evaluation starting on 18 Hawk
3 Hawk - end of day 5

Saturday, 19 September 2015

Hawk Construction Update - Day 4

3 Hawk - start of day 4
13 Hawk getting ready to be hauled away
Found crushed drainage on 5 Hawk green
Examining drainage lines from 5 Hawk green & bunker
3 Hawk - end of day 4

Friday, 18 September 2015

Hawk Update - Day 3

Surveying 2 Hawk green contours
Great morning sun on the 2 Hawk green site
2 Hawk end of day 3
Turf Care staff keeping haul routes clean
Shade evaluation study begins on 8 Hawk
Work begins at 3 Hawk-removing railway ties

New contours on 18 Hawk taking shape
Starting to remove turf on 3 Hawk